Fires in a pot

  • Estado: Closed
  • Premio: $90
  • Propuestas recibidas: 6
  • Ganador: kaihin

Resumen del concurso

I am planning on opening fries specialty shop, which will serve in cinema food court, so I would like the following requirements are needed:

- Layout of the space
- List of machines/equipment like deep fryer, fridge, freezer etc.
- Electrical load schedule

I will attache the proposed location of the shop – 40 sqm – (green space)

Habilidades recomendadas

Comentarios del empleador

“He very nice person to work with :) ”

Imagen del perfil abdullabinfaleh, Qatar.

Tablero de aclaración pública

  • harshpkp
    harshpkp
    • 11 años atrás

    where is the electrical design?

    • 11 años atrás
  • harshpkp
    harshpkp
    • 11 años atrás

    Electrical design?

    • 11 años atrás
  • tsalamon
    tsalamon
    • 11 años atrás

    Do you have any idea on the number of customers to be served at normal and peak capacities, so the right amount of counter space can be provided. Also how many different type of foods are you looking to serve ? French fries, doughnuts, etc. as different food types will require different equipment

    • 11 años atrás
    1. abdullabinfaleh
      Organizador del concurso
      • 11 años atrás

      Hello, one cashier will be fine and only one type of food will be severed which is french fries with many different toppings. some of the toppings is chicken and meat

      • 11 años atrás
  • tsalamon
    tsalamon
    • 11 años atrás

    Hello,

    • 11 años atrás
  • harshpkp
    harshpkp
    • 11 años atrás

    Length, width of the room?

    • 11 años atrás
    1. leshaqtr
      leshaqtr
      • 11 años atrás

      I dont have those information, just do it based on your assumptions

      • 11 años atrás
  • harshpkp
    harshpkp
    • 11 años atrás

    Basic details are missing. Like do you have 3 phase power supply available or single phase? Where are the racks? shelves etc?

    • 11 años atrás
  • gabijames0507
    gabijames0507
    • 11 años atrás

    Hi there, if possible could you provide the entry point, windows and length on each of the walls, also electrical points if already installed

    • 11 años atrás
    1. abdullabinfaleh
      Organizador del concurso
      • 11 años atrás

      It will be customized based on our requirements, nothing have been installed yet

      • 11 años atrás
  • leshaqtr
    leshaqtr
    • 11 años atrás

    Both, even where the machinces will be placed

    • 11 años atrás
  • AvneetChandhok
    AvneetChandhok
    • 11 años atrás

    u require the electrical plan or just the schedule of electrical appliances going to be used?

    • 11 años atrás

Mostrar más comentarios

Cómo comenzar con los concursos

  • Publica tu concurso

    Publica tu concurso Fácil y rápido

  • Recibe montones de propuestas

    Consigue toneladas de propuestas De todo el mundo

  • Elige la mejor propuesta

    Elige la mejor propuesta ¡Descarga fácilmente los archivos!

Publica un concurso ahora o únete a nosotros hoy